| Freely adapted article based on “Guide to Risk Management in Information Security and Cybersecurity”from Portugal's National Cybersecurity Center (CNCS), which can be accessed via the link: https://www.cncs.gov.pt/docs/guia-de-gestao-dos-riscos.pdf. The concepts and fundamentals of risk management were utilized, as well as references to the standards that address this topic. Some terms were adjusted to better suit Brazilian Portuguese. |
INTRODUCTION
A ISO/IEC 31000 provides a set of principles and general guidelines on risk management for organizations. On the other hand, the ISO/IEC 27005 It specifies guidelines and processes for managing the information security risks of an organization’s information systems, drawing in particular on the requirements of an Information Security Management System (ISMS) implemented in accordance with the ISO/IEC 27001 standard. ISO/IEC 27005 does not provide a specific methodology for managing information security risks; it is up to organizations to define their own approach to risk management. In general, the ISO/IEC 27005 risk management methodology, because it is geared toward information systems, can be applied to all types of organizations.
Notes: This Risk Management Guide describes a methodology that, among other things, follows industry best practices; however, does not prevent organizations from adopting other standards that may be more aligned with their objectives.
DEFINITIONS AND ABBREVIATIONS
The following table lists the terms used throughout this document, along with their definitions.
Where applicable, terms defined in standards are used. The “Source” column indicates the standard, reference document, or legislation in which the term is defined.
Table 1 – Tterms used
| Term | Definition | Origin |
| Threat | A potential cause of an undesirable incident that could result in harm to a system, an individual, or an organization. | ISO/IEC 27032 |
| Asset | Anything that is of value to an ISO/IEC 22000-certified organization. | ISO/IEC 22000 |
| Asset | The entire information and communication system, the equipment, and all other physical and logical resources deemed essential—whether managed or owned by the entity—that directly or indirectly support one or more services. | Technical Instruction – Regulation No. 183/2022 |
| Consequence | The outcome of an event that affects the objectives. | ISO 73:2009 |
| Controles | A set of measures that makes it possible to modify risk. | ISO/IEC 27000:2018 |
| Event | The occurrence or change of a particular set of circumstances. | ISO 73:2009 |
| Incident | An event with a real negative impact on the organization. | Adapted |
| Security Incident | Any event that deviates from standard security behavior, thereby causing a real impact—whether in the form of a reduction or total loss of the confidentiality, integrity, or availability of data and information. | ISO/IEC 27000:2018 |
| Risk | A reasonably identifiable circumstance or event with a potential adverse effect on the organization. | Adapted |
| Vulnerability | A weakness in an asset or control that can be exploited by one or more threats. | ISO/IEC 27000:2018 |
| Interested party | A person or organization that can affect, be affected by, or consider itself to be affected by a decision or activity. It may be an individual or a group that has an interest in any decision or activity of an organization. | ISO 22301 |
| Penetration Testing | Penetration testing to assess the security level of networks and systems, using various types of attacks carried out by duly authorized security analysts. | ENISA |
| Information Security Management System (ISMS) | It includes strategies, plans, policies, measures, controls, and various tools used to establish, implement, operate, monitor, critically analyze, maintain, and improve information security. | ISO/IEC 27000:2018 |
- b) ABBREVIATIONS
Table 2 – Abbreviations
| Abbreviation | Definition |
| CISO | Chief Information Security Officer – Information Security Officer. |
| COO | Chief Operations Officer – Head of Operations |
| ISO | International Organization for Standardization – International Organization for Standardization |
| ISO/IEC | International Organization for Standardization/International Electrotechnical Commission – International Organization for Standardization/International Electrotechnical Commission |
| THEE | Essential Service Providers |
| SGSI | Information Security Management System |
| ICT | Information and Communication Technologies |
DOCUMENT STRUCTURE
The document is organized into six sections.
In the chapter “RISK MANAGEMENT”The first phase of the risk management process begins with establishing the context. This phase defines the scope and basic criteria to be considered for managing information security and cybersecurity risks, as well as the procedural implementation geared toward risk management, which enables organizations to make prioritized and informed decisions.
Next is the chapter “RISK ASSESSMENT PROCESS” which identifies, recognizes, quantifies, and describes risks and is intended to enable organizations to assess and prioritize them according to their perceived severity and other established criteria. The risk assessment process consists of the following activities
- risk identification (Step 1);
- risk analysis (Step 2);
- risk assessment (Step 3).
In the chapter “RISK MANAGEMENT” involves identifying, formalizing, and implementing one or more action plans, which are designed to control and/or mitigate the causes of the risks identified in the previous phase.
In the chapter “RISK COMMUNICATION AND CONSULTATION” Activities are presented that aim to reach a consensus on how to manage information security and cybersecurity risks through the exchange and/or sharing of information among those responsible and other stakeholders.
In the chapter “RISK MONITORING AND REVIEW” indicates that the department responsible for the organization’s risk management is responsible for regularly monitoring the organization’s environment so that any changes in the context that may have occurred—and that could result in a change in the perception of risk—are identified in a timely manner.
At the end of the document, there is a EXAMPLE through the practical application of the methodology described in this Risk Management Guide, as well as the respective APPENDICES to the document.
RISK MANAGEMENT
INTRODUCTORY REMARKS
A risk-management-oriented procedural implementation enables organizations to make prioritized and informed decisions. These decisions must always be equally focused on ensuring confidentiality, availability, and integrity in the provision of the good or service.
Risk management, when carried out in a systematic manner and with a focus on continuous improvement, is a practice that enables organizations to identify, quantify, and prioritize risks based on risk acceptance criteria and objectives relevant to the organization.
An organization’s risk management can be understood as the management of uncertainty and the determination of the necessary actions to minimize that uncertainty to levels deemed acceptable by the organization.
In this regard, it is important to introduce some key concepts related to risk management:
- Threat: A potential cause of an undesirable incident that could result in harm to a system, an individual, or an organization.
- Vulnerability: A weakness in an asset or control that can be exploited by one or more threats.
- Impact: It relates to the outcome resulting from the occurrence of a specific security event affecting one or more resources, an event that typically results in direct or indirect consequences for those resources.
- Risk: A reasonably identifiable circumstance or event with a potential adverse effect on the security of networks and information systems.
The risk management process is a structured exercise in which the organization identifies potential threats that could exploit the vulnerabilities of its assets, as well as the associated risk levels, by assessing the probability of occurrence and potential impacts.
A Figure 1 illustrates these high-level concepts and relationships.

Figure 1 – Security concepts and their relationships – adapted from ISO/IEC 15408-1
A Figure 2 presents the risk management process based on the ISO/IEC 27005 standard, which consists of the following phases:
- Set the Context;
- Risk Assessment (which includes the identification, analysis, and evaluation of risk);
- Risk management;
- Acceptance of Risk;
- This is followed by a continuous sequence of the Communication and Consultation and Risk Monitoring and Review phases.

Figure 2 – Risk Management Process; Source: ISO/IEC 27005:2018
In summary, risk management is systematic, structured, and timely, always seeking to implement continuous process improvement.
SETTING THE CONTEXT
The phase of Setting the Context (Figure 3) in the risk management process is essential for its planning and implementation, as it provides an understanding of the criteria, decisions, resources, and internal and external factors relevant to the organization’s purpose that may affect its ability to achieve its defined objectives.

Figure 3 – “Establish Context” – Risk Management Process; Source: ISO/IEC 27005:2018
The organization must first identify its personnel as internal and/or external stakeholders and define the roles and responsibilities for managing information security and cybersecurity risks.
For example, the Table 3 distributes risk-related roles and responsibilities within an organizational context.
Table 3 – Roles and Responsibilities
| Function | Person in Charge | Responsibilities |
| Senior Management | The leadership of the organization responsible for high-level decisions | · Review and approve all decisions made as part of the risk management process;
· Delegate responsibilities within the organization regarding the risk management process. |
| Risk Manager | A mid-level manager who manages risk across the organization | · Oversee the organization's risk management process;
· Ensure that all information necessary for risk identification is collected; · Ensure that all information necessary for the analysis is collected; · Ensure that a risk analysis is conducted; · Ensure that the options chosen to address the risks are the most appropriate; · Ensure that the risk management process remains consistent with the policy, objectives, and other legal and regulatory requirements applicable to the organization; · Ensure that the framework The internal risk management policy is communicated to all employees whose duties are relevant to its implementation. |
| Owner of the Risk | A contracting individual or organization that directly manages each of the assets subject to the risk management process | · Manage assets or information systems and their associated risks, and participate in the risk management process.
· Ensure that the risk is reported to the Risk Manager; · Ensure that risks are identified, analyzed, assessed, and addressed; · Ensure that treatment options are followed. |
It should be noted that, when identifying the governance model best suited to the organization’s specific circumstances, it is also necessary to define the associated scaling process.
In addition to human resources, it is also at this stage that the material resources needed to ensure the proper execution of the rest of the process—such as support tools and risk management processes—must be identified.
Another activity of real importance in this initial phase is defining the scope and boundaries of the risk management process that will take place, identifying and delineating all boundary points, which must be properly justified.
A Table 4 provides an example of a process to be implemented in the ‘Establish Context’ activity.
Table 4 – Example of an “Establish” process C”context"
| Process for Establishing Context | ||
| Inputs | Activities | Outputs |
| · Risk assessment tools and techniques
· Stakeholders' needs and expectations · The organization's vision and responsibilities · Stakeholder perspectives · The organization's objectives regarding information security and cybersecurity requirements |
· Defining the scope and boundaries of risk management;
· Identification of the records to be created and maintained (e.g., meeting minutes, progress reports, etc.); · Identify the governance model to be applied in the risk management process and define an appropriate escalation and accountability process; · Definition of roles and responsibilities, both internal and external. |
· Scope and documented boundaries
· Defined risk approach. · RACI matrix for the risk management process · Risk acceptance criteria |
In conclusion, during this ‘Establish Context’ phase, the objectives, strategies, scope, boundaries, and parameters of the activities of the organizations—or parts of the organization—to which the risk management process will be applied must be defined, as well as the resources necessary to implement it. It is important to note that all decisions made during this stage must be duly approved by the organization’s senior management.
RACI MATRIX
The RACI matrix, or responsibility matrix, enables the various stakeholders to understand their responsibilities throughout the life cycle of a project or process.
Generally, various stakeholders are involved in the risk management process, as appropriate and at specific times, enabling the sharing of knowledge, perspectives, and comprehensive insights regarding risk. To ensure this involvement, the organization must define a risk management governance/organizational model that details the various levels of accountability and stakeholder involvement, specifically through a RACI matrix. This contributes to increased awareness and more informed risk management and decision-making.
The types of RACI roles used are:
- R(responsible) – Person responsible for carrying out the task. Stakeholder who is operationally responsible for completing the activity and achieving the intended result.
- A(ccountable) – Responsible for the success of the task. As a general rule, the Accountable It's unique. The Accountable They always receive the necessary information to oversee the task, but they may also be involved in operational activities as part of carrying out the task. They are usually the ones who review and approve the task before it is considered complete.
- C(consulted) – Provides information relevant to the task, specifically by explaining how the project will affect your work or field of activity.
- I(informed) – Receives information about the task, specifically regarding the activity's progress, without needing the associated details.
Table 5 – RACI Matrix: Example
| Example of a RACI Matrix | |||
| Activities | General Management | Risk Management | Owner of the Risk |
| Activity A | I | R, A | R, C |
| Activity B | I | C | R |
| Activity C | R | C | I |
RISK ASSESSMENT PROCESS
The process of Risk Assessment It quantifies and qualitatively describes risk and enables organizations to prioritize risks based on their perceived severity or other established criteria.
The risk assessment process consists of the following activities:
- Risk identification (Step 1);
- Risk analysis (Step 2);
- Risk assessment (Step 3).
The objectives of this phase are to determine the value of information assets, identify existing (or potential) threats and vulnerabilities, identify existing controls and their effects on the identified risk, determine possible consequences, and, finally, prioritize the resulting risks.
The risk assessment phase is often carried out in two (or more) iterations. Initially, a high-level assessment is conducted to identify potentially high risks, which warrant a second iteration for a more in-depth evaluation. If necessary, additional analyses may be conducted to supplement the risk assessment.
STEP 1 – RISK IDENTIFICATION
The ‘Risk Identification’ phase is the first step in the risk assessment process.
The purpose of ‘Risk Identification’ (Figure 4) is to identify the events that could cause a potential loss to the organization and make it clear how, where, and why this loss might occur.

FFigure 4 – “”Risk Identification” – Risk Management Process; Source: ISO/IEC 27005:2018
It is essential that this stage include risks whose sources may or may not be under the organization’s control, even if the source or cause of the risks is not evident.
For risk identification to be sufficient and appropriate, the process must be carried out in a methodical and organized manner to ensure that all relevant activities have been listed and all risks arising from them have been identified.
Information relevant to risk identification must be pertinent and up-to-date, ensuring the involvement of personnel with the appropriate expertise and that risk identification techniques are applied that are appropriate to the organization’s objectives, its capabilities, and the risks it faces.
To identify risks, various activities can be carried out, such as:
- Analysis of internal and external vulnerabilities;
- Brainstorming with the resources involved in the processes evaluated;
- Surveys of managers or individuals responsible for the processes being evaluated;
- Analysis of internal and external threat scenarios;
- Risk Assessment Workshops (workshops);
- Investigation of cybersecurity incidents;
- Security audits;
- Communication with suppliers, partners, and customers;
- Assessments information security and cybersecurity risks.
Since the objective of this phase is to identify, recognize, and describe the risks that could create constraints or prevent the organization from achieving its objectives, it is necessary to ensure that assets, threats, controls, vulnerabilities, and potential impacts are identified.
A Table 6 provides an example of a process to be implemented in the ‘Risk Identification’ activity.
Table 6 – Risk Identification
| Risk Identification | ||
| Inputs | Activities | Outputs |
| · Feedback number of employees;
· Taxonomies and other external sources |
· Identification of assets;
· Identification of threats; · Identification of existing controls; · Identification of vulnerabilities; · Identification of affected areas/consequences.
|
· List of identified assets;
· List of threats; · List of existing controls; · List of vulnerabilities; · Risks that have been properly identified and documented; · List of plausible risk scenarios. |
The creation and dissemination of these identified lists and catalogs must be carried out across all areas involved in the risk management process, within the established framework.
The activities described in the Table 6 help collect the input data for the activity of Risk Analysis (described in the next subsection).
IDENTIFICATION AND VALUATION OF ASSETS
An asset is something that has value to the organization and therefore requires protection from the organization’s perspective.
“Asset” refers to the entire information and communication system, the equipment, and all other physical and logical resources (applications and platforms for software) considered essential, managed or owned by the entity, that directly or indirectly support one or more services.
However, when it comes to managing information security and cybersecurity risks, it is important to keep in mind that an information system comprises more than hardware e software, and the assets may include (but are not limited to) the following categories:
- Technology (hardware, software, network devices, and systems);
- People;
- Information;
- Physical Environment and Locations;
- Third Party – refers to contractual relationships within or outside the organization.
- (etc.).
Assets must be identified with an appropriate level of detail, providing sufficient information for the risk management process. The level of detail used in identifying assets directly influences the overall amount of information to be processed during the risk analysis and assessment process.
The identification or inventory of assets is not a procedure exclusive to the risk management process; rather, it is a fundamental activity for the management and implementation of an appropriate information security and cybersecurity strategy. Whether through an asset management tool or application or an approved IT service catalog, this database must provide the information necessary to understand the asset’s classification based on its criticality to the organization, the organizational processes supported by the assets, and the identification of dependencies on other assets. In this way, it is possible to have all assets identified, categorized, and listed; it is recommended that there be a single inventory.
The organization must have procedures and practices in place for updating this inventory to ensure that it is accurate and up-to-date, as this is the only way to assess the potential direct or indirect impact that any risk associated with these assets may have on the organization’s operations.
When conducting an inventory of their assets, entities must also identify the persons responsible for each asset. The person responsible for the asset may not have ownership rights to it, but is responsible for its production, development, maintenance, use, and/or security, as appropriate. The person responsible for the asset is often the best-suited individual to determine the asset’s value, interdependencies, and criticality to the organization.
It should be noted that the organization’s networks and information systems located outside its physical facilities must also be identified and cataloged so that the organization is aware of the location of these assets; this includes the proper identification of individuals, physical environments/locations, and their information relevant to the organization.
With regard to the criticality of each asset, this should be based on the impact that a potential failure or unavailability would have on the organization, and its purpose is to ensure that assets receive an appropriate level of protection, based on their importance to the organization. This classification may be based on legal requirements, value, criticality, and the sensitivity of the information contained in the asset, among other factors.
For example, the criticality of assets can be determined by the asset’s replacement cost, specifically the cost of recovering, cleaning, or replacing the information. Another way to assess the value of assets may be based on the values of Confidentiality, Integrity, and Availability, using an average of the values associated with these dimensions.
(Confidentiality + Integrity + Availability) / 3 = Asset Value
It should be noted that instead of conducting asset-oriented risk management, this process can be carried out at the “process” level, as recommended by ISO 9001, by establishing a link between business process, asset, and risk.
IDENTIFICATION OF THREATS
A threat has the potential to cause negative impacts and consequences on an organization’s assets (which may include information, processes, systems, people, etc.) and, consequently, can compromise organizations.
Threats can arise from within or outside the organization; they can be natural or man-made, and they can be accidental or intentional.
Information about potential threats can be obtained in the following ways:
- Review of past incidents;
- Interview with the person in charge of the asset;
- User perception;
- Opinions from experts in information security and physical security;
- Information from the legal departments;
- Information disseminated through the media;
- Information provided by public institutions and/or other entities relevant to the organization’s or national security;
- Catalog of Common Threats such as those suggested in the Appendix A of this document; and
- Catalog of threats in your area of operation.
Source of threats:
- System failure;
- Natural phenomenon;
- Human error;
- Malicious attack;
Failure by a third party to supply goods or services.
The experience the organization has gained in managing and learning from cybersecurity incidents and related threats should be taken into account when assessing the current risk.
A Table 7 provides an example of a process to be implemented in the ‘Threat Identification’ activity.
Table 7 – Identification of Threats
| Threat Identification | ||
| Inputs | Activities | Outputs |
| Threat information obtained from the various sources consulted | Identification of threats and their respective sources of information.
|
List of threats. |
IDENTIFICATION OF EXISTING CONTROLS
When identifying risk factors, it is necessary to assess the effectiveness of the controls implemented within the organization, as well as their current status in terms of implementation and use, given the current situation, in order to avoid unnecessary costs and work.
Examples of controls include the security measures documented in the QNRSC, organized according to the objectives of Identify, Protect, Detect, Respond, and Recover.
To identify existing controls, the following activities, by way of example, should be considered:
- Review of documents containing information on the implementation of controls (for example: previous plans for implementing risk management processes). If the information security management processes are properly documented, all planned and/or existing controls and their respective implementation status should be available for review;
- Consult with those responsible for information security and cybersecurity (e.g., CISO, COO) to determine which controls are actually in place;
- Conduct an on-site assessment to evaluate the implementation of physical controls, comparing those that are properly implemented with the list of controls that should be in place, and verifying, among those that are implemented, whether they are functioning correctly and effectively.
It is important to keep in mind that a control—or set of controls—that is implemented incorrectly can result in potential vulnerabilities for the organization.
IDENTIFICATION OF VULNERABILITIES
A vulnerability is a weakness in an asset or a control that can be exploited by a threat; the latter is a potential cause of an unwanted incident, which can result in damage to a system, an individual, or an organization.
An organization's environment may be subject to a wide variety of vulnerabilities, which can also be identified, in particular, through the use of proprietary tools, such as conducting scans vulnerabilities and penetration testing (network or system penetration testing).
However, more broadly speaking, you can find it at the Appendix B This document lists certain vulnerabilities to assist in their use in the risk management process; these vulnerabilities are categorized as follows:
- Hardware;
- Software;
- Network;
- Human resources or people;
- Physical environment (location or facilities); and
- The organization and its processes and procedures.
Below are some examples of the most common vulnerabilities:
- Inappropriate or negligent use of physical access controls to buildings and rooms;
- Susceptibility to fluctuations in electric current;
- Single point of failure;
- Transmission of passwords in plain text;
- Lack of controls for managing off-site assets;
- Incorrect use of software e hardware;
- Lack of records in the logs administrator and operator;
- Insufficient maintenance and/or faulty installation of data storage devices, among other things.
It is important to note, however, that the existence of one or more vulnerabilities does not, in and of itself, cause harm. For harm to occur, there must be a threat—whether intentional or not—that exploits or is facilitated by those vulnerabilities.
Finally, a risk management process capable of achieving the objectives for which it was created must be based on an efficient and thorough vulnerability management process, since it is only through the latter that risks can be satisfactorily identified.
STEP 2 – RISK ANALYSIS
The second step in the risk assessment process is the ‘Risk Analysis.’.
‘Risk Analysis’ (Figure 6) aims to determine the sources of the identified risks, their consequences and impacts, and the probability of their occurrence.

Figure 6 – “Risk Analysis” – Risk Management Process; Source: ISO/IEC 27005:2018
To carry out this phase, the organization must have a list identifying the threats and vulnerabilities, the affected assets, and the controls in place and their effectiveness—all of which were previously identified and analyzed (Step 1 of Risk Identification).
The Risk Analysis should also take into account:
- A history of extraordinary events that have occurred;
- The history of incidents, and in particular, incidents with significant impact;
- number of users affected by the incidents;
- The duration of these incidents;
- Its geographic distribution, with respect to the affected area;
- Cross-sectoral dependencies for the purpose of service delivery.
To better understand the various concepts in this stage, consider the following definitions:
- Causes: Risk factors, whether internal or external to the organization, must be recorded in accordance with the threats and vulnerabilities previously identified and within the scope defined for this risk management process;
- Risk: Risk is expressed as the combination of an event’s impact and its probability of occurring. This risk is calculated without taking into account the effects of any treatment or the application of existing controls.
To determine the risk, it is recommended to use a Risk Matrix (see Chapter C: Determining the Risk Level), recording the risk value as the highest among all identified causes.
????? = ????????????? ? ???????
This equation can, however, be expanded to reflect the threat of exploiting vulnerabilities in assets by replacing the concept of ‘probability’ with ‘probability of a threat exploiting the vulnerability.’ By also adopting the principle that the impact value is the total consequence or cost of a compromised asset, the equation can be reformulated as follows:
????? = (????????????? ?? ????ç? ???????? ? ???????????????) ? (????? ????? ?? ??????? ?? ????? ?????????)
For any of these risk descriptions, the methodology must assign values to these factors. Although there are many different approaches, they essentially fall into two categories: qualitative and quantitative.
Other important concepts to consider are:
- Inherent risk: Inherent risk is the amount of risk that exists despite the controls in place at the time the risks are identified.
- Residual risk: Residual risk is the amount of risk that remains or arises after implementing additional controls and/or making adjustments to existing controls.
RISK ANALYSIS METHODOLOGY
The risk analysis methodology can be approached analytically, using a qualitative, quantitative, or combined approach.
- Qualitative risk analysis: It uses a scale of qualification attributes to identify the severity of potential impacts (for example: Low, Medium, and High) and the probability of such occurrences. One of the disadvantages of this methodology is the subjectivity of the scale in question. Qualitative analyses should use factual data and information.
- Quantitative risk analysis: It uses a scale of numerical values to assess impacts and probabilities and must be supported by various sources. The quality of the analysis depends on the accuracy and integrity of the numerical values and the validity of the models used. Quantitative risk analysis typically uses historical incident data, thus offering the advantage of being directly linked to the organization’s information security objectives and concerns. Quantitative analysis may be disadvantageous if factual and/or auditable data are not available. This situation can create a false impression of precision and effectiveness in the risk assessment process.
The risk analysis methodology to be used should be consistent with that defined in the ‘Establish Context’ phase. In this Guide, a qualitative analysis will be used, as it is intended to be applicable to a wide range of organizations and will facilitate understanding among the various stakeholders, particularly with regard to general indicators of risk level and the identification of the most relevant risks.
PROBABILITY AND IMPACT CRITERIA
The criteria for determining the probability and impact of risks must take into account the context described above, the organization’s business objectives, and the objectives of risk management itself. This analysis must be conducted in a thorough and consistent manner.
Probability describes the expected frequency with which a risk event will occur over a given period. This value may be based on statistical data regarding past incidents or on expert opinion.
The guidelines for the evaluation criteria can be found in the Figure 7.
It should be noted that probability is not necessarily directly proportional to impact; it is possible for the probability of an event occurring to be very high while the impact is very low.

Figure 7 – Risk Analysis Criteria
In order to better assess the impact of risk, the organization may identify an overall impact without specifying criteria or may base its assessment on potential consequences according to impact vectors as categorized at the following levels:
- Legal or regulatory – any legal and regulatory consequences the organization may face at the national and international levels, such as the General Data Protection Regulation or the General Data Protection Act;
- Operating/Financial Losses – an area that accounts for the loss of operational capacity of the services provided, particularly ICT services and the SGSI, and the inevitable financial loss incurred in order to restore the capacity that existed prior to the materialization of the risk;
- Productivity losses – an area that assesses the internal impact on the provision of a service, good, or system that prevents employees or stakeholders from fulfilling their duties and responsibilities;
- Loss of customers – assesses the impact that the risk has on the organization’s portfolio of clients and/or partners;
- Reputation and Image – an area focused on the impact resulting from the materialization of risks to the organization’s external image and reputation, such as the loss of stakeholder trust;
- Safety and Health – an area that reflects the impact of risks materializing in terms of personal health and safety, which must be ensured for the organization’s employees and stakeholders.
Table 8 provides a definition of each impact level for all assessment areas when risks materialize; however, this does not preclude the use of a single, generic impact criterion.
TTable 8 – Definition of each impact level for all consequence areas upon the occurrence of risks
| Impact Levels | Legal and Regulatory | Operating/Financial Losses | Productivity Losses | Loss of Customers | Reputation and Image | Safety and Health |
| Very High (5) | Very high legal/regulatory impact, with associated heavy fines, which could result in the interruption of the service, product, or system | Significant operational disruption, which may be total and/or permanent | Internal and external impacts that compromise the delivery of a service, good, or system, forcing employees or stakeholders to fail to fulfill their duties and responsibilities | Widespread dissatisfaction among a group of customers critical of the business, with no possibility of reversing the situation | The event is known outside the organization and has been reported by media outlets | Tracking employee absences due to sick leave or insurance-related leave, with a significant impact on the organization. |
| High (4) | Significant legal/regulatory impact involving associated fines | Partial operational outage with a significant impact on operations | An internal or external impact that compromises the delivery of a service, good, or system, forcing employees or stakeholders to fail to fulfill their duties and responsibilities
|
Dissatisfaction among a group of customers critical of the business, with the possibility of turning the situation around. | The event is known outside the organization and was posted by individuals | Recording absences for employees on sick leave or on insurance-related leave, affecting more than one department within the organization |
| Medium (3) |
Moderate legal/regulatory impact |
Partial operational disruption with some residual impact on operations | An internal or external impact that compromises the delivery of a service, good, or system, forcing employees or stakeholders to partially fail to fulfill their duties and responsibilities | Dissatisfaction among a significant group of customers, with the possibility of resolving the situation. | The event was limited to the organization internally | Records of employee absences due to sick leave or insurance-related leave, with an impact on a department or area of the organization |
| Bass (2) | Minor legal/regulatory impact | Partial operational disruption with very little impact on operations | An internal impact that compromises the delivery of a service, good, or system, but does not prevent employees from fulfilling their duties and responsibilities | Dissatisfaction among a small group of customers, with the possibility of resolving the situation. | The event was confined to the department or area |
Tracking employee absences due to sick leave or insurance-related leave, with no impact on the organization's operations |
| Very Low (1) | No legal or regulatory impacts are anticipated | No operational or financial impact on the organization | An internal impact that does not compromise the provision of the service or system, and does not prevent employees from fulfilling their duties and responsibilities | Dissatisfaction among a small group of customers, with the possibility of resolving the situation immediately. | The incident was contained within the affected area | No record of employee absences due to sick leave or insurance claims |
Notes: The descriptions in the table above are suggestions and may be modified according to the criteria that are most appropriate for the organization.
If there are multiple affected areas with different levels of impact, the level of impact to be considered should be the highest one.
DETERMINING THE RISK LEVEL
By weighing the potential impact of risks on the business against the probability of those risks materializing, the risk level can be assigned on a scale of:
- 5 – very high;
- 4 – high;
- 3 – medium;
- 2 – bass;
- 1 – very low.
This definition makes it possible to establish an order of priority for addressing critical risks, based on the level assigned to them.
A Risk Matrix in the Figure 8 distributes the risks as follows:

Figure 8 – Risk Matrix
Note: There are events that have serious consequences and impacts on an organization’s business and, on the surface, a very low probability of occurring. This type of event is commonly referred to as a “Black Swan,” as it describes highly improbable occurrences. Examples of such events include the September 11 attacks on the Twin Towers (2001) and the nuclear accident at Fukushima (2011), or even the impact of the COVID-19 pandemic (2020). In a risk analysis, this type of event must also be taken into account.
DEFINITION OF THE RISK LEVEL FOR ESSENTIAL SERVICES
Essential Service Operators (ESOs) are public or private organizations that provide an essential service, falling within the following sectors and subsectors: energy (subsectors: electricity, oil, and gas); transportation (subsectors: air transportation, rail transportation, maritime and inland waterway transportation, as well as road transportation); banking, financial market infrastructure, health care (subsector: health care facilities), drinking water supply and distribution, and digital infrastructure.
Given the very definition of an essential service (OES), it is believed that a failure or interruption of an essential service will have a more significant or substantial impact on society; therefore, it is proposed that a more conservative risk matrix be used, such as the one presented in the Figure 9.

Figure 9 – Risk Matrix for Operators of Essential Services
In this matrix, it is important to note that the impact of a risk materializing should be weighted more heavily than the probability of its occurrence.
At this stage of the risk analysis, an impact value and a probability are assigned to each identified scenario.
STEP 3 – RISK ASSESSMENT
The third and final stage of the risk assessment process is ‘Risk Assessment.’ ‘Risk Assessment’ (Figure 10) is intended to assist in decision-making regarding risk management, based primarily on the premise of a acceptable level of risk.
Based on the analysis and determination of the level of inherent risks conducted in the previous steps, it is necessary to assess which risks require action to be mitigated, transferred, or avoided, and which risks can be accepted within the context of the organization.

Figure 10 – “Risk Assessment” – Risk Management Process; Source: ISO/IEC 27005:2018
This phase of the risk assessment allows for an informed decision regarding which controls should be used and in what order the risks should be addressed. It is important to note that, in order for such decisions to be made appropriately, they must not disregard the legal, normative, and regulatory requirements and other conditions to which the organization is subject.
Some criteria used to assess information security and cybersecurity risks include:
- ASSESSING THE MATURITY OF EXISTING CONTROLS
By this stage, the inherent risk is already known; therefore, by analyzing the controls that mitigate the inherent risk, we can determine the actual risk.
When identifying risk factors, it is necessary to verify the effectiveness of the controls already in place within the organization in order to avoid unnecessary costs and work, such as the duplication of controls. When identifying controls, it is necessary to verify them to ensure they are functioning correctly, since a poorly implemented control can create a vulnerability.
Controls are measures that modify risk. Controls can be processes, policies, devices, practices, or other actions that modify risk. It should be noted that controls do not always have the intended or assumed risk-modifying effect.
The assessment of the maturity of each control can be based on the levels of capability demonstrated in the Table 9.
A given maturity level is considered to have been achieved when all the capabilities described at that level and at lower levels have been met.
Table 9 – Capability Levels for Identifying Controls
| Capacity | Description |
| 1 – INITIAL | Basic security measures that could be implemented to achieve the security objective, particularly in initiatives ad hoc, through isolated and informal initiatives. |
| 2 – INTERMEDIATE | Security measures that address most cases and needs in order to achieve information security objectives. These measures are formally implemented. |
| 3 – ADVANCED | Advanced security measures that involve continuous monitoring of controls, as well as recurring assessments and reviews that take into account changes, incidents, tests, and exercises, with the aim of proactively improving them. |
- BUSINESS IMPACT ASSESSMENT
At this stage, the actual risk to which the service is exposed is already known, since the inherent risk has already been reduced based on the measured average maturity level of the respective controls.
It is within this framework that the actual assessment of event scenarios identified as relevant to the company’s activities will take place, including the identification of threats, vulnerabilities, affected assets, and consequences for those assets, existing controls, and business processes, with the aim of measuring the potential impact on the organization. The consequences of information security breaches must be considered, such as: loss of confidentiality, integrity, or availability of assets.
If a criterion is not relevant to the organization—for example, a breach of confidentiality, since it works only with public data—then all risks that affect this criterion may not be relevant.
- RISK ACCEPTANCE LIMITS
Once the organization has defined its risk acceptance criteria, it must identify the risk level at which formal approval from top management will be required for the risk to be accepted.
On the other hand, the acceptance criteria may vary depending on the risk’s duration if it is associated with a temporary or short-term activity of the organization.
- PRIORITIZATION BASED ON RISK LEVEL AND BUSINESS RELEVANCE
At this stage, as mentioned earlier, each organization should prioritize risks based on a detailed analysis of the severity of the risks and the extent of their consequences for the organization, taking into account its specific characteristics, such as its industry, internal structure, business objectives, etc.
If a process or asset has been classified as low importance, the risks associated with it should be less significant than the risks that impact more important processes, activities, or assets.
RISK MANAGEMENT
The ‘Risk Treatment’ Phase’ (Figure 11) involves identifying, formalizing, and implementing one or more action plans, which are designed to control and/or mitigate the causes of risk identified during the risk analysis phase.

Figure 11 – “Risk Treatment” – Risk Management Process; Source: ISO/IEC 27005:2018
For each action, it is essential to designate a person in charge and set a date for implementation. The goal is that, once the action plans are completed, they will lead to new mitigation initiatives or improvements to existing ones, thereby reducing the level of risk.
In other words, risk management is a cyclical process consisting of several phases, which, broadly speaking, consist of:
- Evaluate the risk management measures the organization has already implemented;
- Analyze and determine whether the residual risk levels are acceptable to the organization;
- If not, define and implement a new approach to addressing the risks in question;
- Evaluate the effectiveness of recently implemented treatments.
A Table 10 provides an example of a process to be implemented in the ‘Risk Management’ activity.
Table 10 – Risk Management
| Risk Management | |||
| Appetizers (Inputs) | Activities | Outputs (Outputs) | |
| Risks Analyzed | · Development of risk management options;
· Risk management planning; · Selection of treatment options; · Implementation of risk mitigation measures; · Analysis of the efficiency and effectiveness of the · treatments performed; · Monitoring and reviewing controls · implemented in accordance with the risk management plans.
|
· Treatment options;
· Treatment plans for · risks. |
|
After following the steps outlined in Table 10, The cycle of risk assessment and treatment implementation begins anew.
The possible ways to address these risks are described below:
- Mitigate or Modify: Reduce risk exposure by developing action plans and implementing specific controls; additional controls may be implemented to mitigate the risk or reduce it to a level that meets the risk acceptance criteria defined by the organization.
- Avoid: Eliminate the cause of the risk by eliminating the process that generates it. This approach aims to discontinue business activities or information or support assets that serve as a source of risk to the organization, thereby permanently eliminating the risk. Typically, this option is considered when the treatment plan involves excessively high costs and the targeted business activity or asset is no longer of significant importance to the organization’s business objectives.
- Download or Share: Shift responsibility for the consequences to third parties. Responsibility for the risk is transferred to an entity other than the organization; for example, insuring business assets or activities by assigning responsibility for them to suppliers or other partners.
- Accept or Withhold: Acknowledge the risk without implementing controls. Only low- and very low-level risks may be retained; accept the decision not to take any corrective action regarding the risk and accept the consequences it may have for the organization should it materialize. This option is used in situations where:
- The risk falls within the acceptance criteria defined by the organization;
- When the cost of implementing controls to reduce the risk level exceeds the cost of the risk itself if it were to materialize.
A Table 11 provides an example of the recommended treatment for each identified risk level:
Table 11 – Example of Risk Treatment
| Inherent Risk Score and Treatment | |
| Description | Recommended treatment |
| Very Low | Accept |
| Bass | Accept/Mitigate/Transfer |
| Medium | Mitigate/Transfer |
| High | Mitigate/Transfer |
| Very Tall | Avoid |
The department responsible for analyzing, assessing, and addressing identified risks is tasked with evaluating and developing risk management plans in accordance with the risk management process illustrated in the Figure 12.

Figure 12 – Risk Treatment; Source: ISO/IEC 27005
Risks identified as “Very High” must be addressed. Essential Service Operators must address all risks classified as “High” and “Very High.”.
There are various options for managing risks, and they can be implemented individually or simultaneously. The selection of the most appropriate options for each case analyzed must take into account the level of the risks in question, the costs and efforts involved in implementing the chosen treatment, and the benefits of that treatment for the organization—or, conversely, the losses that such treatment will avoid or prevent.
Risk treatment plans are used to document which treatment options have been selected, as well as how and in what order they should be implemented. These plans should specify the details of the procedure for selecting and implementing treatments, such as:
- the reasons for those choices and the benefits intended to be achieved through them;
- identify those responsible for approving and implementing the treatment plan;
- identify the proposed actions;
- identify the resources, performance metrics, and constraints that are required;
- present a timeline and implementation plan.
Risk treatment plans must clearly indicate the order of priority for implementing the treatments that have been deemed necessary.
Information security and cybersecurity risk treatment plans must be addressed in the Risk Matrix to ensure proper monitoring and treatment of the identified risks.
RISK COMMUNICATION AND CONSULTATION
“Risk Communication” (Figure 13) is an activity aimed at reaching consensus on how to manage information security and cybersecurity risks through the exchange and/or sharing of risk-related information among those responsible and other stakeholders. This communication is important because equally effective risk management approaches may be more acceptable to some parties than to others, given their common and specific interests and objectives.

Figure 13 – “Risk Communication and Consultation” – Risk Management Process; Source: ISO/IEC 27005:2018
It is essential to understand that without establishing a culture of risk management within the organization, the objectives and safety goals we aim to achieve may be compromised.
Therefore, it is important to emphasize the importance of implementing a risk management culture through the regular dissemination of knowledge generated by the application of the Risk Management Guide within the organization and the involvement of the various stakeholders. Consideration should also be given to periodically reviewing risks and verifying the status of information security and cybersecurity risk treatment plans, with presentations and analysis of the results to senior management.
In the Table 12 It is possible to identify the activities related to risk communication and consultation.
Table 12 – Communication and Consultation
| Risk Communication and Consultation | ||
| Appetizers (Inputs) | Activities | Outputs (Outputs) |
| Perspectives of relevant stakeholders; | Development of the communication and consultation plan; | Communication and Consultation Plan. |
The organization shall establish a risk communication and consultation plan to ensure the commitment of those responsible for risks—whether internal or external—in accordance with the structure of the communication plan established. The risk communication and consultation plan shall ensure that:
- All of the outputs Changes to risk management practices, including decisions to modify them, are communicated through predefined channels (including agreements between the parties on how to manage each of the practices used in the process, such as risk treatment and response);
- The information shared is sufficiently detailed to achieve the objectives of the risk management process and the organization;
- The reported information is derived from decisions related to the organization’s risk management process and is sent to the designated risk officers;
- External parties are appropriately informed of decisions related to the organization’s risk management process whenever applicable;
- Communication channels are used as a means to build greater trust and raise awareness among external stakeholders regarding risk issues and decisions resulting from the organization’s risk management process.
RISK MONITORING AND REVIEW
The department responsible for the organization’s risk management is tasked with regularly monitoring the organization’s environment so that any changes in the context that may have occurred—and that could result in a change in the perception of risk—are identified in a timely manner.
Monitoring and critical analysis may be conducted on a periodic basis—as required to maintain the risk management cycle and ensure continuous improvement of the process—as well as in the event of a specific incident.

Figure 14 – “Risk Monitoring and Review” – Risk Management Process; Source: ISO/IEC 27005:2018
The purpose of monitoring and critically analyzing risks is to:
- verify the effectiveness and efficiency of the controls that have been implemented;
- obtain additional information to improve the risk assessment process as a whole;
- analyze events and potential incidents so that we can learn from them;
- identify changes in circumstances that could alter the risk level classification or the type of treatment that best aligns with business objectives;
- identify emerging risks.
It is recommended that the results obtained be recorded so that they can be studied and the information security risk management process can be continuously and progressively improved, in addition to assisting in the performance analysis of the procedures, methods, and tools that have been implemented.
The organization must ensure that the following items are monitored on an ongoing basis:
- new assets to be included within the scope of the risk management process;
- changes in the criticality of assets to the organization (for example: due to changed business requirements);
- new threats that may be active, both inside and outside the organization, and that have not yet been assessed;
- the possibility that new vulnerabilities could be exploited by threats;
- a potential increase in the impact, consequences of threats, vulnerabilities, or aggregated risks that result in an unacceptable level of risk;
- information security incidents that may occur.
EXAMPLE
João, who heads the organization's Project Management Department, identified the need to conduct a risk analysis.
Following the guidelines in this Guide, João should begin risk management by establishing the context, in which he identifies the roles and responsibilities of the stakeholders in the process—for example, by determining the RACI matrix for each of them— the risk acceptance criteria, and the definition of scope and boundaries, among other things.
Once the context has been established, João must conduct the risk assessment process, taking the following steps into account:
- Step 1 – Risk identification;
- Step 2 – Risk analysis;
- Step 3 – Risk assessment;
To identify the risks, João decided to conduct a assessment an assessment of information security and cybersecurity risks, in which assets, threats, existing controls, and vulnerabilities were identified. In this regard, the following risk was identified:
There is a high risk that user passwords for the file management platform—hosted on a cloud computing service—could be stolen. The organization uses this platform to make available all documentation generated in connection with the execution of its projects.
- Assets: file management platform; documentation generated in connection with project implementation;
- Threats: External malicious attack
- Existing controls: password policy
- Vulnerabilities: a flawed password policy that compromised the confidentiality and integrity of the information stored on this asset.
To conduct the risk analysis, João must take the following into account:
- risk analysis methodology: quantitative risk analysis;
- probability and impact criteria:
- General impact: “4 – High”;
- Probability: “5 – Very High”;
- risk level assessment: “20 – Very High,” based on the defined risk matrix;
Given the identified level, the organization cannot accept it, since all “Very High” risks must be addressed, unless they have been formally accepted by Senior Management. In that case, the organization, during its risk management meeting, may make the strategic decision to mitigate the risk and carry out the following activities:
- Ensure that the file management platform provider amends its password management policy in accordance with your internal practices within a timeframe to be determined;
- Evaluate other platforms that provide the same service, under conditions deemed appropriate by the organization.
A person responsible—Inês, Director of Information Systems—was also identified to carry out these risk management activities, and an estimated resolution date was agreed upon. The date was chosen based on the priorities assigned to the identified risks, taking into account the level of risk and the criticality of the assets involved.
APPENDICES
Catalog of Common Threats
The following table contains examples of common threats. The list can be used during the threat assessment process. Threats can be intentional, accidental, or environmental (natural).
The list also indicates, for each type of threat, whether it can be classified as I (intentional), A (accidental), or N (natural).
Table 13 – Examples of Common Threats
| Types of Threats | Threats | Origin |
| (i) System failure; | Air conditioning failure | A |
| Equipment failure | A | |
| Equipment defect | A, I | |
| Information System Overload | A | |
| Software defect | A | |
| Violation of the terms of use of the information system that enable its maintenance | A, I | |
| (ii) Natural phenomenon;
|
Climate phenomenon | N |
| Seismic phenomenon | N | |
| Volcanic phenomenon | N | |
| Weather phenomenon | N | |
| Flood | N | |
| iii) Human error;
|
Improper Disclosure of Information | A, I |
| Data from unreliable sources | A, I | |
| Hardware Modification | I | |
| Software Update | A, I | |
| Unauthorized access to systems | A, I | |
| Use of counterfeit or illegal software copies | A, N, I | |
| Illegal data processing | I | |
| System defects (“bugs”) | A, I | |
| iv) Malicious attack;
|
Cyberespionage | I |
| Unauthorized eavesdropping | I | |
| Theft of storage devices or documents | I | |
| Theft of equipment | I | |
| Data Recovery from Recycled or Discarded Storage Devices | I | |
| Hardware Modification | I | |
| Software Update | A, I | |
| Determining the Location | I | |
| Social engineering | I | |
| System intrusions, infiltrations, and unauthorized access | I | |
| Unauthorized access to systems | I | |
| Cybercrime (e.g., cyberbullying); | I | |
| Fraudulent acts (e.g., unauthorized reuse of credentials and transmitted data, impersonation, interception); | I | |
| Bribery in exchange for information; | I | |
| Spoofing (impersonating someone else); | I | |
| Use of Malicious Code (e.g., viruses, ransomware, Trojan horses, etc.) | I | |
| Bomb/terrorism; | I | |
| Information war; | I | |
| Attacks on systems (e.g., distributed denial-of-service attacks); | I | |
| Information Theft | I | |
| Personal Data Breach | I | |
| Blackmail, bribery, assault, or extortion of employees | I | |
| Search for intellectual property information | I | |
| Improper Use of Computing Resources | I | |
| Entry of falsified or corrupted data | I | |
| Interception of Information | I | |
| System Sabotage | I | |
| Unauthorized Use of Equipment | I | |
| Illegal software copying | I | |
| Use of counterfeit or illegal software copies | A, N, I | |
| Data Compromise | A, I | |
| Illegal data processing | I | |
| Forging Rights | I | |
| v) Failure to supply goods or services from thirds; | Water Service Interruption | A, I |
| Power Outage | A, N, I | |
| Interruption of Telecommunications Service | A, I | |
| vi) Others; | Fire | A, N, I |
| Water | A, N, I | |
| Pollution | A, N, I | |
| Serious accident | A, N, I | |
| Destruction of equipment or storage devices | A, N, I | |
| Dust, corrosion, freezing | A, N, I | |
| Electromagnetic radiation | A, N, I | |
| Thermal radiation | A, N, I | |
| Electromagnetic pulses | A, N, I | |
| Error during use | A | |
| Abuse of rights | A, I | |
| Condemnation of Actions | I | |
| Lack of human resources | A, N, I |
- Vulnerability Catalog
The following table contains some examples of vulnerabilities. The list can be used during the vulnerability assessment process.
Table 14 – Vulnerability Databases
| Types | Examples of vulnerabilities | Examples of threats |
| Hardware
|
Insufficient maintenance/Improper installation of storage devices | Violation of the terms of use of the information system that enable its maintenance |
| Lack of a routine for periodic replacement | Destruction of equipment or storage devices | |
| Sensitivity to moisture, dust, and dirt | Dust, corrosion, freezing | |
| Sensitivity to electromagnetic radiation | Electromagnetic radiation | |
| Lack of effective configuration change control | Error during use | |
| Sensitivity to voltage fluctuations | Power Outage | |
| Sensitivity to temperature fluctuations | Weather phenomenon | |
| Unsecured storage | Theft of storage devices or documents | |
| Lack of care during disposal and destruction | Theft of storage devices or documents | |
| Uncontrolled copying | Theft of storage devices or documents | |
| Software | Insufficient or nonexistent software testing procedures | Abuse of rights |
| Known software bugs | Abuse of rights | |
| Failure to log out when leaving a workstation unattended or unsupervised | Abuse of rights | |
| Destruction or reuse of storage devices without following the proper data erasure procedures | Abuse of rights | |
| Absence of an audit trail | Abuse of rights | |
| Improper Assignment of Access Rights | Abuse of rights | |
| Widely distributed software | Data Compromise | |
| Using programs with the wrong data set (from a different period) | Data Compromise | |
| Complex user interface | Error during use | |
| Incorrect parameter settings | Error during use | |
| Incorrect dates | Error during use | |
| Lack of authentication and identification mechanisms, such as those used for user authentication | Abuse of Privileges | |
| Lists of unprotected passwords | Abuse of Privileges | |
| Poor password management | Abuse of Privileges | |
| Unnecessary services remain enabled | Illegal data processing | |
| New or immature software | Software defect | |
| Confusing or incomplete specifications for developers | Software defect | |
| Lack of effective change control | Software defect | |
| Uncontrolled downloading and use of software | Software Update | |
| Lack of backups | Software Update | |
| Lack of physical security measures in the building, on doors, and on windows | Theft of storage devices or documents | |
| Absence of management reports | Unauthorized Use of Equipment | |
| Network | Lack of evidence proving that messages were sent or received | Condemnation of Actions |
| Unsecured communication lines | Unauthorized communication interception | |
| Unprotected sensitive traffic | Unauthorized communication interception | |
| Poorly made wiring connections | Telecommunications Equipment Failure | |
| Failure to identify and authenticate the sender and the recipient | Forging Rights | |
| Insecure network architecture | Cyberespionage | |
| Transfer of passwords in plain text | Cyberespionage | |
| Inadequate network management (in terms of routing flexibility) | Information System Overload | |
| Unsecured public network connections | Unauthorized Use of Equipment | |
| People
|
Lack of human resources | Lack of human resources |
| Inadequate recruitment procedures | Destruction of equipment or storage devices | |
| Insufficient safety training | Error during use | |
| Improper use of software and hardware | Error during use | |
| Lack of safety awareness | Error during use | |
| Lack of monitoring mechanisms | Illegal data processing | |
| Unsupervised work by cleaning staff or contractors | Theft of storage devices or documents | |
| Lack of policies regarding the proper use of telecommunications and messaging services | Unauthorized Use of Equipment | |
| Location or facilities
|
Inappropriate use of, or failure to exercise due care regarding, the mechanisms controlling physical access to buildings and rooms | Destruction of equipment or storage devices |
| Location in a flood-prone area | Flood | |
| Unstable power supply | Power Outage | |
| Lack of physical security measures in the building, on doors, and on windows | Theft of equipment | |
| Organization | Lack of a formal procedure for registering and removing users | Abuse of rights |
| Lack of a formal process for the critical review of access rights (oversight) | Abuse of rights | |
| Insufficient or nonexistent provisions (related to safety) in contracts with customers and/or third parties | Abuse of rights | |
| Lack of a procedure for monitoring information processing facilities | Abuse of rights | |
| Lack of periodic audits (oversight) | Abuse of rights | |
| Lack of procedures for identifying, analyzing, and assessing risks | Abuse of rights | |
| No error reports in the audit logs for administrator and operator activities | Abuse of rights | |
| Inadequate response from the maintenance service | Violation of the terms of use of the information system that enable its maintenance | |
| No Service Level Agreement or an insufficient one | Violation of the terms of use of the information system that enable its maintenance | |
| Lack of a change control procedure | Violation of the terms of use of the information system that enable its maintenance | |
| Lack of a formal procedure for reviewing ISMS documentation | Data Compromise | |
| Lack of a formal procedure for overseeing SGSI records | Data Compromise | |
| Lack of a formal process for authorizing publicly available information | Data from unreliable sources | |
| Inappropriate assignment of responsibilities for information security | Condemnation of Actions | |
| Lack of a business continuity plan | Equipment failure | |
| Lack of a policy on the use of electronic mail (e-mail) | Abuse | |
| Lack of procedures for installing software on operating systems | Error during use | |
| Absence of entries in the audit logs of administrators and operators | Error during use | |
| Lack of procedures for handling classified information | Error during use | |
| Absence of information security responsibilities in job descriptions and role definitions | Error during use | |
| Insufficient or missing (safety-related) provisions in employee contracts | Illegal data processing | |
| No disciplinary proceedings in cases involving information security incidents | Theft of equipment | |
| Lack of a formal policy on the use of mobile devices | Theft of equipment | |
| Lack of control over off-site assets | Theft of equipment | |
| No or insufficient “clear desk and clear screen” policy | Theft of storage devices or documents | |
| Lack of authorization for information processing facilities | Theft of storage devices or documents | |
| Lack of established mechanisms for monitoring security breaches | Theft of storage devices or documents | |
| Lack of periodic critical reviews by management | Unauthorized Use of Equipment | |
| Lack of procedures for reporting security vulnerabilities | Unauthorized Use of Equipment | |
| Lack of procedures to ensure compliance with intellectual property rights | Use of counterfeit or illegal software copies |